Jump to content

EU Centre of ExcellenceISO 9001

ERCIMW3C MemberFraunhofer Project Center

András Kovács, Ph.D., senior research fellow
András Kovács
Address: 1111 Budapest, Kende u. 13-17.
Mail address: 1111 Budapest, Kende u. 13-17, Hungary
Room number: K 416
Phone: +36 1 279 6189
E-mail: kovacs.andrasEZT_TOROLJE_KI@EZT_TOROLJE_KIsztaki.hu
Homepage: http://www.sztaki.hu/~akovacs/
Department: Research Laboratory on Engineering & Management Intelligence

Research interests:
Modeling and solving optimization problems in the field of production and logistics, production planning and scheduling, constraint programming, combinatorial optimization

Publications

[order by time] [order by categories ]

2018.

Towards joint optimization of product design, process planning and production planning in multi-product assembly
Authors: Tsutsumi, D; Gyulai, Dávid; Kovács, András; Tipary, Bence; Ueno, Y; Monostori, László
Date: 2018.
Published by: CIRP ANNALS-MANUFACTURING TECHNOLOGY (Volume no.: 67, Issue no.: 1, Page: 441-446)
On the Computational Complexity of Tariff Optimization for Demand Response Management
Authors: Kovács, András
Date: 2018.
Published by: IEEE TRANSACTIONS ON POWER SYSTEMS (Volume no.: 33, Issue no.: 3, Page: 3204-3206)
Multi-Modal Interfaces for Human–Robot Communication in Collaborative Assembly
Authors: Horváth, Gergely; Kardos, Csaba; Kemény, Zsolt; Kovács, András; Pataki, Balázs; Váncza, József
Date: 2018.
Published by: ERCIM NEWS (Issue no.: 114, Page: 15-16)
Generating HumanWork Instructions from Assembly Plans
Authors: Kardos, Csaba; Kovács, András; Pataki, Balázs; Váncza, József
Date: 2018.
Published by: 28th International Conference on Automated Planning and Scheduling, ICAPS 2018, UISP 2018, Proceedings of the 2nd Workshop on User Interfaces and Scheduling and Planning (Page: 31-39)
Context-dependent multimodal communication in human-robot collaboration
Authors: Kardos, Csaba; Kemény, Zsolt; Kovács, András; Pataki, Balázs; Váncza, József
Date: 2018.
Published by: PROCEDIA CIRP (Volume no.: 72, Page: 15-20)

2017.

Decomposition approach to optimal feature-based assembly planning
Authors: Kardos, Csaba; Kovács, András; Váncza, József
Date: 2017.
Published by: CIRP ANNALS-MANUFACTURING TECHNOLOGY (Volume no.: 66, Issue no.: 1, Page: 417-420)

2016.

Process planning and offline programming for robotic remote laser welding systems
Authors: Erdős, Ferenc Gábor; Kardos, Csaba; Kemény, Zsolt; Kovács, András; Váncza, József
Date: 2016.
Published by: INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING (Volume no.: 29, Issue no.: 12, Page: 1287-1306)
Process planning and offline programming for robotic remote laser welding systems
Authors: Erdős, Ferenc Gábor; Kardos, Csaba; Kemény, Zsolt; Kovács, András; Váncza, József
Date: 2016.
Published by: INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING (Volume no.: 29, Issue no.: 12, Page: 1287-1306)
Towards Feature-based Human-robot Assembly Process Planning
Authors: Kardos, Csaba; Kovács, András; Váncza, József
Date: 2016.
Published by: PROCEDIA CIRP (Volume no.: 57, Page: 516-521)
Optimized joint motion planning for redundant industrial robots
Authors: Erdős, Ferenc Gábor; Kovács, András; Váncza, József
Date: 2016.
Published by: CIRP ANNALS-MANUFACTURING TECHNOLOGY (Volume no.: 65, Issue no.: 1, Page: 451-454)
Online Learning for Aggregating Forecasts in Renewable Energy Systems
Authors: Csáji, Balázs Csanád; Kovács, András; Váncza, József
Date: 2016.
Published by: ERCIM NEWS (Issue no.: 107, Page: 40-41)
Integrated task sequencing and path planning for robotic remote laser welding
Authors: Kovács, András
Date: 2016.
Published by: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (Volume no.: 54, Issue no.: 4, Page: 1210-1224)
Intelligent control for energy-positive street lighting
Authors: Kovács, András; Bátai, Roland; Csáji, Balázs Csanád; Dudás, Péter; Háy, Borbála; Pedone, Gianfranco; Révész, Tibor; Váncza, József
Date: 2016.
Published by: ENERGY (Volume no.: 114, Page: 40-51)
Bilevel programming approach to optimizing a time-variant electricity tariff for demand response
Authors: Kovács, András
Date: 2016.
Published by: (Page: 698-703)

2015.

Integrated task sequencing and path planning for robotic remote laser welding
Authors: Kovács, András
Date: 2015.
Published by: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (Volume no.: xx, Page: 1-17)

2014.

Workstation Configuration and Process Planning for RLW Operations
Authors: Erdős, Ferenc Gábor; Kardos, Csaba; Kemény, Zsolt; Kovács, András; Váncza, József
Date: 2014.
Published by: PROCEDIA CIRP (Volume no.: 17, Page: 783-788)
An inverse economic lot-sizing approach to eliciting supplier cost parameters
Authors: Egri, Péter; Kis, Tamás; Kovács, András; Váncza, József
Date: 2014.
Published by: INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (Volume no.: xx, Issue no.: xx, Page: xx-xx)
An inverse economic lot-sizing approach to eliciting supplier cost parameters
Authors: Egri, Péter; Kis, Tamás; Kovács, András; Váncza, József
Date: 2014.
Published by: INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (Volume no.: 149, Page: 80-88)
Prediction and Robust Control of Energy Flow in Renewable Energy Systems
Authors: Csáji, Balázs Csanád; Kovács, András; Váncza, József
Date: 2014.
Published by: (Page: 3663-3669)
Monitoring and Controlling Energy-positive Public Lighting: the E+grid System
Authors: Csáji, Balázs Csanád; Háy, Borbála; Kovács, András; Pedone, Gianfranco; Révész, Tibor; Váncza, József
Date: 2014.
Published by: ERCIM NEWS (Volume no.: 98, Page: 36-37)
Capacity management for assembly systems with dedicated and reconfigurable resources
Authors: Gyulai, Dávid; Kádár, Botond; Kovács, András; Monostori, László
Date: 2014.
Published by: CIRP ANNALS-MANUFACTURING TECHNOLOGY (Volume no.: 63, Issue no.: 1, Page: 457-460)
Collision-free Path Planning for Remote Laser Welding
Authors: Kovács, András
Date: 2014.
Published by: (Page: 172-181)
E+GRID: Energy-positive adaptive street lighting
Authors: Bátai, R; Balázs, L; Révész, Tibor; Pedone, Gianfranco; Kovács, András; Prikler, L
Editor: Devonshire, R; Zissis, G
Date: 2014.
Published by: (Page: 145-148)
Adaptive Aggregated Predictions for Renewable Energy Systems
Authors: Csáji, Balázs Csanád; Kovács, András; Váncza, József
Date: 2014.
Published by: (Page: 132-139)

2013.

Task Sequencing for Remote Laser Welding in the Automotive Industry
Authors: Kovács, András
Editor: Daniel, Borrajo; Subbarao, Kambhampati; Angelo, Oddi; Simone, Fratini
Date: 2013.
Published by: Proceedings of the 23th International Conference on Automated Planning and Scheduling (ICAPS 2013) (Page: 457-461)
Planning of remote laser welding processes
Authors: Erdős, Ferenc Gábor; Kemény, Zsolt; Kovács, András; Váncza, József
Date: 2013.
Published by: PROCEDIA CIRP (Volume no.: 7, Page: 222-227)
Inventory control in supply chains: Alternative approaches to a two-stage lot-sizing problem
Authors: Kovács, András; Egri, Péter; Kis, Tamás; Váncza, József
Date: 2013.
Published by: INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (Volume no.: 143, Issue no.: 2, Page: 385-394)
Generating alternative process plans for complex parts
Authors: Nonaka, Y; Erdős, Ferenc Gábor; Kis, Tamás; Kovács, András; Monostori, László; Nakano, T; Váncza, József
Date: 2013.
Published by: CIRP ANNALS-MANUFACTURING TECHNOLOGY (Volume no.: 62, Issue no.: 1, Page: 453-458)
Exact solution approaches for bilevel lot-sizing
Authors: Kis, Tamás; Kovács, András
Date: 2013.
Published by: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (Volume no.: 226, Issue no.: 2, Page: 237-245)

2012.

A cutting plane approach for integrated planning and scheduling
Authors: Kis, Tamás; Kovács, András
Date: 2012.
Published by: COMPUTERS & OPERATIONS RESEARCH (Volume no.: 39, Issue no.: 2, Page: 320-327)
On bilevel machine scheduling problems
Authors: Kis, Tamás; Kovács, András
Editor: Stein, C.; Uetz, M.; Vredeveld, T.
Date: 2012.
Published by: OR SPECTRUM: QUANTITATIVE APPROACHES IN MANAGEMENT (Volume no.: 34, Issue no.: 1, Page: 43-68)
An Inverse Economic Lot-sizing Approach to Eliciting Supplier Cost Parameters
Authors: Egri, Péter; Kis, Tamás; Kovács, András; Váncza, József
Editor: Robert, W; Hans, H
Date: 2012.
Published by: Seventeenth International Working Seminar on Production Economics (Page: 197-207)

2011.

A global constraint for total weighted completion time for unary resources
Authors: Kovács, András; Beck, J
Date: 2011.
Published by: CONSTRAINTS (Volume no.: 16, Issue no.: 1, Page: 100-123)
A system for the detailed scheduling of wind farm maintenance
Authors: Kovács, András; Erdős, Ferenc Gábor; Viharos, Zsolt János; Monostori, László
Date: 2011.
Published by: CIRP ANNALS-MANUFACTURING TECHNOLOGY (Volume no.: 60, Issue no.: 1, Page: 497-501)
WindMT: An integrated system for failure detection and maintenance scheduling at wind farms
Authors: Kovács, András; Csempesz, János; Erdős, Ferenc Gábor; Karnok, Dávid; Kemény, Lőrinc; Monostori, László; Viharos, Zsolt János
Date: 2011.
Published by: ICAPS 2011, The 21st International Conference on Automated Planning and Scheduling, Proceedings of System Demonstrations (Page: 46-49)
Scheduling the maintenance of wind farms for minimizing production loss
Authors: Kovács, András; Erdős, Ferenc Gábor; Monostori, László; Viharos, Zsolt János
Editor: Bittanti, ; Sergio, ; Cenedese, ; Angelo, ; Zampieri, ; Sandro,
Date: 2011.
Published by: 18th World Congress of the International Federation of Automatic Control (Page: 14802-14807)
Optimizing the storage assignment in a warehouse served by milkrun logistics
Authors: Kovács, András
Date: 2011.
Published by: INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (Volume no.: 133, Issue no.: 1, Page: 312-318)
Constraint programming approach to a bilevel scheduling problem
Authors: Kovács, András; Kis, Tamás
Date: 2011.
Published by: Constraints (Volume no.: 16, Issue no.: 3, Page: 317-340)

2010.

Digital enterprise solution for integrated production planning and control
Authors: Monostori, László; Erdős, Ferenc Gábor; Kádár, Botond; Kis, Tamás; Kovács, András; Pfeiffer, András; Váncza, József
Date: 2010.
Published by: Computers in Industry (Volume no.: 61, Issue no.: 2, Page: 112-126)
AI supported maintenance and reliability system in wind energy production
Authors: Viharos, Zsolt János; Monostori, László; Erdős, Ferenc Gábor; Kovács, András
Date: 2010. 04. 20.
Published by: EWEC 2010. European wind energy conference and exhibition. Warsaw, 2010. (Page: 1-12)
Artificial intelligence applications for maintenance oriented health monitoring of wind turbines
Authors: Viharos, Zsolt János; Erdős, Ferenc Gábor; Kovács, András; Monostori, László
Date: 2010. 05. 25.
Published by: Gépészet 2010. Proceedings of the 7th conference on mechanical engineering. Budapest, 2010. (Page: 403-413)
Exploiting repetitive patterns in practical scheduling problems
Authors: Kovács, András; Váncza, József
Editor: Sihn, W.; Kuhlang, P.
Date: 2010. 05. 26.
Published by: 43rd CIRP international conference on manufacturing systems. Sustainable production and logistics in global networks. Proceedings. Vienna, 2010. (Page: 868-875)
Approaches to inventory management in supply chains: a comparative study
Authors: Kovács, András; Egri, Péter; Kis, Tamás; Váncza, József
Date: 2010. 08. 23.
Published by: In Proc. of the 16th International Symposium on Inventories (Page: 107)

2009.

An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups
Authors: Kovács, András; Brown, K. N.; Tarim, S. A.
Date: 2009.
Published by: International Journal of Production Economics (Volume no.: 118, Page: 282-291)
An Efficient MIP Model for the Capacitated Lot-sizing and Scheduling Problem with Sequence-dependent Setups
Authors: Kovács, András; Brown, Kenneth N.; Tarim, S. Armagan
Date: 2009.
Published by: International Journal of Production Economics (Volume no.: 118, Page: 282-291)
Constraint programming approach to a bilevel scheduling problem
Authors: Kovács, András; Kis, Tamás
Editor: Salido, M. A.; Barták, R.
Date: 2009.
Published by: COPLAS 2009. Proceedings of the workshop on constraint satisfaction techniques for planning and scheduling problems. Thessaloniki, 2009. (Page: 17-26)
AI supported maintenance and reliability system in wind energy production
Authors: Monostori, László; Viharos, Zsolt János; Erdős, Ferenc Gábor; Kovács, András
Editor: Burczynski, T.; Cholewa, W.; Moczulski, W.
Date: 2009.
Published by: AI-METH 2009. Artificial intelligence methods. Symposium proceedings. Gliwice, 2009. (AI-METH series.)

2008.

A global constraint for total weighted completion time for cumulative resources
Authors: Kovács, András; Beck, J. Christopher
Date: 2008.
Published by: Engineering Applications of Artificial Intelligence (Volume no.: 21, Issue no.: 5, Page: 691-697)
Optimizing the Storage Assignment in a Warehouse Served by Milkrun Logistics
Authors: Kovács, András
Date: 2008.
Published by: 15th International Symposium on Inventories (Page: 112)

2007.

A global constraint for total weighted completion time
Authors: Kovács, András; Beck, J. Christopher
Date: 2007.
Published by: CPAIOR 2007. Integration of AI and OR techniques in constraint programming for combinatorial optimization problems. 4th international conference. Brussels, 2007. (Lecture notes in computer science 4510.) (Page: 112-126)
Single-machine scheduling with tool changes: a constraint-based approach
Extensions of the COMPLETION constraint
Authors: Kovács, András; Beck, J. Christopher
Date: 2007.
Published by: COLPAS`07: CP/ICAPS 2007 joint workshop on constraint satisfaction techniques for planning and scheduling problems. Providence, 2007. (Page: 1-7. (CD))
Constraint-based scheduling with total completion time criterion: models and applications
Authors: Kovács, András; Beck, J. Christopher
Date: 2007.
Published by: MIM'07. IFAC workshop on manufacturing modelling, management and control. Budapest, 2007. (Page: 139-144)

2006.

The interval flow shop model
Authors: Kis, Tamás; Drótos, Márton; Erdős, Ferenc Gábor; Kovács, András
Editor: Jozefowska, J; Weglarz, J
Date: 2006.
Published by: PMS 2006. Tenth international workshop on project management and scheduling. Poznan, 2006. (Issue no.: 4, Page: 217-221)
Real-time, cooperative enterprises: management of changes and disturbances in different levels of production
Authors: Monostori, László; Váncza, József; Márkus, András; Kis, Tamás; Kovács, András; Erdős, Ferenc Gábor; Kádár, Botond; Viharos, Zsolt János
Date: 2006.
Published by: CIRP Journal of Manufacturing Systems (Volume no.: 35, Issue no.: 4, Page: 351-359)
Progressive solutions: a simple but efficient dominance rule for practical RCPSP
Authors: Kovács, András; Váncza, József
Date: 2006.
Published by: Lecture Notes in Computer science (Volume no.: 3990, Page: 139-151)
Novel models and algorithms for integrated production planning and scheduling
Authors: Kovács, András
Date: 2006.
Published by: (Length: 115 page)
An Efficient MIP Formulation for the Capacitated Lot-sizing and Scheduling Problem with Sequence-dependent Setups
Authors: Kovács, András; Brown, KN; Tarim, SA
Date: 2006.
Published by: 14th International Symposium on Inventories (Page: 77)

2005.

Structural exploration of constraint-based scheduling problems
Authors: Kovács, András; Márkus, A.; Váncza, József
Date: 2005.
Published by: CIRP JOURNAL OF MANUFACTURING SYSTEMS (Volume no.: 34, Issue no.: 4, Page: 291-298)
Real-time, cooperative enterprises: management of changes and disturbances on different levels of production
Authors: Monostori, László; Váncza, József; Márkus, A.; Kis, Tamás; Kovács, András; Erdős, P.; Kádár, Botond; Viharos, Zsolt János
Date: 2005.
Published by: 38th CIRP international seminar on manufacturing systems. Florianópolis, 2005. (Page: 1-6)
Proterv-II: an integrated production planning and scheduling system
Authors: Kovács, András; Egri, Péter; Kis, Tamás; Váncza, József
Date: 2005.
Published by: LECTURE NOTES IN COMPUTER SCIENCE (Volume no.: 3709, Page: 880)
Project-oriented approach to production planning and scheduling in make-to-order manufacturing
Authors: Egri, Péter; Kovács, András; Márkus, A.; Váncza, József
Date: 2005.
Published by: PRODUCTION SYSTEMS AND INFORMATION ENGINEERING (Volume no.: 2, Page: 23-36)
Integrált termeléstervezés és ütemezés megrendelésre történő gyártásban
Authors: Kovács, András; Egri, Péter; Váncza, József
Date: 2005.
Published by: GÉPGYÁRTÁS (Volume no.: 45, Issue no.: 1, Page: 45-47)

New search