EPIC CoE project (2017-2024): Centre of Excellence in Production Informatics and Control (EPIC CoE), European Commission, H2020 project grant No. 739592 [Work Package manager of WP7: Developing the regional Cyber Physical Production (CPP) & Innovation ecosystem and widening socio-economic impact]
ANTON Technolgy Development project (2020): Development of the core SMD technolgy: situation detection & technological parameter-optimisation for the machining dividion (SMD) of AQ ANTON& Increasing the efficiency of the pointcloud based, iterative reference setup for free surfaces on various machining platforms of AQ ANTON, Industial Project. [sponsor & project manager]
INEXT project (2018-2023): Research on prime exploitation of the potential provided by the industrial digitalisation, National Research, Development and Innovation Office project (ED_18-2-2018-0006). [project member]
ANTON Technolgy Development project (2019): Development of the core SMD technolgy: situation detection & technological parameter-optimisation for the machining dividion (SMD) of AQ ANTON& Increasing the efficiency of the pointcloud based, iterative reference setup for free surfaces on various machining platforms of AQ ANTON, Industial Project. [sponsor & project manager]
Industry 4.0 research ((2016-)2019-2020): Industry 4.0 research and innovation center of excellence, National Research, Development and Innovation Office project (GINOP-2.3.2-15-2016-00002). [project member]
AQ ANTON SMD Technolgy Development project (2018): Development of the core SMD technolgy: situation detection & technological parameter-optimisation and patent preparation for the machining dividion (SMD) of AQ ANTON, Industial Project. [sponsor & project manager]
ANTON SMD Technolgy Development project (2015-2017): Development of the core SMD technolgy: situation detection & technological parameter-optimisation and production simulation for the machining dividion (SMD) of ANTON, Industial Project. [sponsor & project manager]
ANTON SMD Scheduler project (2014-2015): Development and introduction of an integrated production scheduling system for the machining division (SMD) of ANTON, Industial Project. [sponsor & project manager]
iKOMP project (2014-2017): Highly industrialised region on the west part of Hungary with limited R&D capacity: Research and development programs related to strengthening the strategic future-oriented industries manufacturing technologies and products of regional competences carried out in comprehensive collaboration, National R&D Competitiveness and Excellence Contracts Project. [project manager and scientific coordinator]
Gamesa Health Monitoring (HMS) System project (2012-2013): Health Monitoring System (HMS) for Gamesa wind turbines, Industial Project. [sponsor & project manager]
Gamesa training project (2011-2012): Training and documentation preparation of the Advanced Wind Turbine Health Monitoring and Maintenence System, Industial Project. [sponsor & project manager]
(QC)2 project (2010-2012): (QC)2 - Quantifiable Closed Quality Control, EU 7th
FrameWork (CorNet) project. [project manager]
ReliaWind
project (2008-2011): Reliability focused research on optimizing Wind Energy systems design, operation and maintenance: Tools, proof of concepts, guidelines & methodologies for a new generation, EU 7th
FrameWork project. [project manager]
Knorr-Bremse
Fékrendszerek Kft. (2008): Production data based data mining
project preparation case for self learning of failures, effects, roots and causes.
[project idea preparation, manager]
Oracle
partnership (2008-2010): Establishment and
management of the MTA SZTAKI's partnership with ORACLE. Solutions are
mainly served for the
financial sector especially in audit solutions. [sponsor & partnership manager]
Innovation activities at financial leasing service providers (2006-2009):
efficient
save and restore of extremely large databases in oracle environment;
archiving of large databases of ERP systems; remote access of central
systems of a middle-size company having distributed locations;
intelligent dispatching of IT related business processes in database
systems; Enterprise Application Interface (EAI) introduction, efficient
handling of the interface jungle; advanced architecture and development
environment for an internal prepared, software having various goals;
conceptual project for IT audit followed by a pilot Hungarian
introduction of the novel software Oracle Audit Vault; collection of
requirements through business process analysis for introduction of a
central authorization system; intelligent techniques for failure-less
data fill-in in ERP systems; concept and software realization of
electronic billing system introduced at first in leasing branch in
Hungary; analysis and improvement of the loss in the value calculation
using statistics and data mining techniques. [sponsor and
project manager]
Multisens
Project (2004-2006): Cameras as multifunctional sensors for
automated processes, EU 6th Framework research program:
Co-operative Research Project. [project manager]
Daily
Scheduling project for GE
Consumer & Industrial (2005): Enhance the functionality and
performance of the existing information system to support the new daily
planning and scheduling initiative together
with interfaces to the pallet tracking solution.
[sponsor & project manager]
Intelligent
techniques of production control (2003-2006), National
Scientific Research Foundation (OTKA), Hungary, Grant
No.: T043547 [project manager]
VRL-KCiP (2004-2007): Virtual Research Lab for Knowledge
Community in Production, A network of excellence of the 6th
Framework Programme of the European Commission. [task manager]
VITAL
project (2004-2007): IT
support for real-time, cooperative enterprizes, National
Research and Development Program of Hungary,
Information
and Communication Technologies. [project member]
Adaptive, distributed production structures and networks (2001-2004), Bolyai János Research Scholarship (Hungarian Academy of Sciences, MTA), Hungary, [personal scholarship]
Special product failure detection solution for GE
Lighting/Automotive (2003): Supporting product quality and working behaviour related data and information collection, data processing and data flow preparation, artificial neural network based modelling for failure detection and building up a discrete logic based decision making solution for detecting special finished product failure(s).
[sponsor & project manager]

Széchenyi
Plan, (2001-2004) National Research and Development Program,
Information
and Communication Technologies, "Digital Enterprises,
production networks"
project, project manager of the 3. work-cluster (Monitoring
of complex
production structures); Széchenyi Terv:
(2001-2004) Nemzeti Kutatási és Fejlesztési Program, Információs és
Kommunikációs
Technológiák, "Digitális
Vállalatok, termelési hálózatok" c. projekt,
a 3. cluster (Komplex
gyártási stuktúrák felügyelete) projektvezetője. [cluster manager]

HITELAP
project (2000): Detemining the optimal size of the ordered row material of the production plant of the Hungarian firm producing one- and
multi-layered
printed wires to reach maximal surface utilisation and minimum the mean
flow time (Technológiai fejlesztési projekt a gyártási méret és
illesztés
optimalizálására). [project manager]

FORD
project (1998): Quality testing of 1.1 kW starter motors by learning
algorithm
to decide if the force of the spring of the copper-brush of a starter
motor
is enough or not (to achieve 100% end-testing). [sponsor & project manager]
Intelligent
techniques in quality management
National
Scientific Research Foundation (OTKA), Hungary
Supervisor:
Zs. J. Viharos
Grant
No.: F026326
Duration:
1998-2000
Earlier projects [student membership]:
Fundamental
research on intelligent manufacturing, National Scientific Research Foundation (OTKA), Hungary, Supervisor: L. Monostori Grant No.: T014514 Duration: 1994-1996.
Quality
Management and Fuzzy Logic, Hungarian-Austrian
Intergovernmental S&T Cooperation Program, Supervisor::
L. Monostori, Grant
No.: 33, Duration:
1995-1996.
Fundamental
research on intelligent manufacturing, II., National
Scientific Research Foundation (OTKA), Hungary, Supervisor:
L. Monostori, Grant
No.: T016512, Duration:
1995 - 1997.
DYCOMANS:
Dynamic Control and Management Systems in Manufacturing Processes, COPERNICUS
Program of the European Union, Hung.
supervisor: L. Keviczky, L. Monostori, Grant
No. 01246., Duration:
1995-1997.
REMADE:
Re-engineering of Manufacturing Processes through Simulation and
Dynamic
control Techniques, PHARE
TDQM Program of the European Union, Hung.
supervisor: L. Monostori, Grant
No. HU-9305-02/1071, Duration:
1996-1997.
Research
grants extends over the next research period, Integration
In Manufacturing and Beyond (IIMB), ESPRIT
LTR Working Group, Hung. supervisor: L. Monostori, Grant
No. IIMB 21108, Duration:
1996-1999.
Intelligent
Manufacturing Systems (IMS), ESPRIT
LTR Working Group, Hung.
supervisor: L. Monostori, Grant
No. IMS 21955., Duration:
1997-2000.
Subsymbolic
and hybrid AI methods for financial and business applications, National
Scientific Research Foundation (OTKA), Hungary, Supervisor:
L. Monostori, Grant
No. T023650, Duration:
1997 - 1999.
Integration
in Manufacturing, National
Committee for Technological Development (OMFB), Supervisor:
L. Monostori, Grant
No. E. 0029 960202, Duration:
1997-1999.
Changes
and disturbances in production systems, National
Scientific Research Foundation (OTKA), Hungary, Supervisor:
L. Monostori, Grant
No. under evaluation, Duration:
1998 - 2000.
Autonomous,
cooperative systems in production, National
Committee for Technological Development (OMFB), Supervisor:
L. Monostori, Grant
No. E. 099/97.06.24, Duration:
1997-1999.
DYCOMANS:
Dynamic Control and Management Systems in Manufacturing Processes II., COPERNICUS
Program
of the European Union, Hung.
supervisor: L. Keviczky, L. Monostori, Duration:
1998-2000.
...
|